Asbestos Abatement in Bremerton, WA
Bremerton has a higher share of pre-1980 homes than any other area on this site, and its growth dates to the shipyard boom.
Older buildings in Bremerton
During World War II, Bremerton grew to about 80,000 people, with more than 32,000 working at the Puget Sound Naval Shipyard. Housing was so short that shift workers shared beds. The federal government built housing projects including Westpark, Eastpark and Sheridan Park to keep up.
Today 64.4 percent of Bremerton homes were built before 1980, the highest share of the 14 areas on this site, and the median home dates to 1969. Older neighborhoods such as Manette (annexed in 1918) and Charleston (annexed in 1927) predate even the war.
If a building predates 1980, test before you disturb it. See where asbestos hides in older homes and how our surveys work.
Asbestos rules for Bremerton projects
Bremerton, WA is under the Puget Sound Clean Air Agency (PSCAA), which covers King, Kitsap, Pierce and Snohomish counties.
Survey
Before a renovation, an AHERA certified building inspector has to survey any material the work will disturb. The one exception is an owner-occupant renovating their own single-family home. Before a demolition, an AHERA survey is required with no exceptions.
Asbestos removal notice
Removing 10 linear feet or more of friable asbestos on pipe, or 48 square feet or more on other materials, requires written notice to PSCAA before work starts. Projects of 260 linear feet or 160 square feet and up also carry a 10-day waiting period after notice.
Demolition notice
Demolishing any structure with a roof area over 120 square feet requires PSCAA notification and a 10-day wait, even when the survey finds no asbestos at all.
Fees
A single-family residence asbestos notification is $25. Current PSCAA fees.
State certification
In Washington, only a certified asbestos contractor can bid or perform abatement. Every job needs a certified supervisor on site and certified workers doing the removal. Projects over 48 square feet or 10 linear feet also get their own L&I notification, normally filed at least 5 days before work starts.
Permits
Building and demolition permits come from the City of Bremerton Department of Community Development.
TAC handles the survey, the PSCAA and L&I notices and the abatement. Questions about your project? Read the FAQ or call us.
What we do in Bremerton
- Asbestos Abatement & Encapsulation
- Asbestos & Mold Survey / Inspection
- Lead Remediation & Stabilization
- Mold Remediation
- General & Select Demolition
- Total Loss Inventory
Restoration or mitigation contractor? See how we work with restoration crews.
Common questions in Bremerton
Do I need an asbestos survey before remodeling or demolishing in Bremerton?
Before a renovation, an AHERA certified building inspector has to survey any material the work will disturb. The one exception is an owner-occupant renovating their own single-family home. Before a demolition, an AHERA survey is required with no exceptions. Bremerton, WA falls under the Puget Sound Clean Air Agency.
How long is the waiting period after notifying PSCAA?
Larger asbestos removals (260 linear feet or 160 square feet and up) and every demolition over 120 square feet wait 10 days after notice. Smaller removals need notice before work starts but no waiting period. PSCAA can waive the waiting period for a sudden hazard, to protect equipment or utilities, or when asbestos turns up that the survey missed.
Does Tacoma Abatement Company work in Bremerton?
Yes. Our yard at 3829 S M Street in Tacoma is about 33 road miles from Bremerton. Estimates are free and on site. Abatement projects have an $800 minimum. Call (253) 830-5945, Monday to Friday, 7 AM to 5 PM.